← Back to practice← All notes
Home › RES exam notes › Lesson 2
Free RES exam notes · Lesson 2

Lesson 2: Master Plan & Planning notes

Which plan says what, how much can be built, what each zoning allows and when URA’s permission is needed. Expect calculations (GFA, site coverage, number of units) and questions matching a rule to its zoning.

5years
Master Plan reviewed at least once every
85m²
divisor for number of units outside the Central Area (100 m² in nine estates)
60/40
industrial: core use vs ancillary GFA
3months
shortest consecutive stay allowed in a private home

1The planning system

From broad strategy down to plot-level detail.

Long-Term Planformerly the Concept Plan; 50 years and beyond; reviewed about every 10 years; broad areas and rail lines, not plots
turned into▸
Master Planthe statutory plan; zoning and plot ratios for 10 to 15 years; reviewed at least every 5 years
detailed by▸
SDCPsSpecial and Detailed Control Plans published by URA for certain areas
Current planMaster Plan 2025, gazetted on 1 December 2025.
SDCPs cover
Parks, waterbodies, public spacesLanded housing areasStreet blocksEnvelope controlBuilding heightUrban designConservation areas, conserved buildings, monumentsConnectivityUnderground

Master Plan shows

Zoning (main use) and gross plot ratio, read with its Written Statement. Tenure, lot numbers and ownership are SLA records, not Master Plan.

Street Block Plan

For a street or group of plots: land use, building form, setbacks, storey and building height.

Written Permission

From URA: planning, subdivision and conservation permission. Must follow the Master Plan unless the Minister approves a departure (e.g. temporary permission). Ancillary, related or compatible uses may be allowed.

Needs Written Permission

  • Building works
  • Demolition and rebuilding
  • Subdividing land
  • Changing a building’s use
  • One house used as two or more
  • Works adding GFA or changing the façade
  • Ads on parts of a building not normally used for them

BCA’s TOP and CSC are separate and come at completion.

Government Land Sales

SLA appoints URA, HDB and JTC as land sales agents (JTC: Industrial GLS). Announced every half-year. Confirmed List: scheduled dates. Reserve List: released when a developer’s minimum price is accepted (the developer must then bid at least that) or on enough market interest.

Lease terms

Recent URA residential, hotel, White: 99 yearsJTC industrial: nominally 20 or 30 yearsNew industrial GLS since March 2025: +3 years for construction (23 or 33)

2How much can be built

Plot ratio limits total floor area; site coverage limits the footprint.

Maximum GFA

GPR × land area. GPR 2.8 on 11,500 m² = 32,200 m².

Land needed

GFA ÷ GPR. 16,800 m² at GPR 4.2 = 4,000 m².

Site coverage

Footprint as % of net site area (less road widening, drainage reserves). Flats, condos: 50%. (8,400 − 400) × 50% = 4,000 m².

Counts as GFA

  • Covered areas, air-conditioned or not
  • Uncovered commercial areas (outdoor dining)
  • Existing floor area on the site
  • All strata area (from 1 June 2023)

From 1 June 2023: measured to the middle of external walls. Bonus GFA schemes: up to 10% above Master Plan GPR in total.

Voids and other areas

Void: open space with no floor slab, e.g. above a double-volume living room. From 1 June 2023 applications, voids are excluded from strata area (shown for reference only). Earlier strata area could include them, so check older units.

Nett internal area excludes voids, balconies, air-con ledges. NLA: from the inside face of external walls, excluding common areas (stairwells, toilets, lift lobbies).

Residential GPR (no special height control)Storeys
1.45
1.612
2.124
2.836
Not in the tableSpecial height control areas follow the Building Height Plan. A non-standard GPR such as 1.7 is evaluated by URA; don’t round.

3Homes

Minimum sizes, unit counts, landed areas and who may stay.

Condominium

Land at least 4,000 m².

Flats

Land at least 1,000 m².

Strata landed

At least 50 m² ground contact each. Never a condominium.

Mixed landed and apartments

No condominium status.

Outside the Central Area

Units = allowable GFA ÷ 85 m², rounded down. 32,200 ÷ 85 = 378.8, so 378.

Divisor 100 m² in nine estates:

Marine ParadeJoo Chiat–MountbattenTelok Kurau–Jalan EunosBalestierStevens–ChanceryPasir PanjangKovan–How SunShelfordLoyang

Central Area

No cap on units, but at least 20% must be 70 m² or bigger (nett internal).

Guide for any private flat or condo unit: at least 35 m² nett.

Landed housing areaHouses allowed
Good Class Bungalow AreaDetached only, up to 2 storeys. Plot at least 1,400 m², 18.5 m wide, 30 m deep. Site coverage at most 45% (35% sub-control, counting balconies, roof terraces).
Semi-Detached Housing AreaDetached and semi-detached.
Mixed Landed Housing AreaDetached, semi-detached and terrace.
Landed Housing Areas PlanNo flats in safeguarded areas, even if zoned Residential. Shows the estates, house types and building envelope.
Landed heightEstate is 2-storey (max 12 m) or 3-storey (max 15.5 m) under envelope control.
Minimum plot elsewhereSize and width
Bungalow400 m², 10 m wide; site coverage max 50% (40% sub-control)
Semi-detached200 m²; 8 m wide side by side, 10 m back to back
Terrace Type IIntermediate 150 m², 6 m wide; corner 200 m², 8 m wide
Terrace Type II80 m²; 6 m wide (intermediate) or 8 m (corner); standard 2 m road setback, own enclave

Terraces: a row of at least 3; no site coverage control.

Executive condominiums

Years 0–5: MOP
After 5: Citizens and PRs only
After 10: anyone, incl. foreigners
MOP starts5 years10 years
EC land tenders closing on or after 8 May 2026No sale at all for 10 years; fully private after 15 years.

Private homes

Stays under 3 consecutive months are short-term accommodation: not approved. Fines starting at up to $5,000; up to $200,000 per charge in serious cases. Max 6 unrelated occupants (8 for homes of at least 90 m² registered with URA, until 31 December 2028).

Serviced apartments

Let for at least 7 days (SA II: at least 3 months). Owned and managed as one block, so no strata subdivision; not in landed areas. Converting flats needs planning permission.

4Commercial, hotel and mixed zonings

Know the percentages and which way round they go.

ZoningKey rule
CommercialMixed development: at least 60% commercial GFA (outside historic districts).
Commercial & ResidentialAt least 60% residential, at most 40% commercial, unless URA allows otherwise. Commercial below the homes.
Residential with Commercial at 1st StoreyShops normally on the 1st storey only (HDB blocks, shophouses). Any commercial above or below can’t exceed the 1st-storey maximum in total. No disturbing uses (karaoke).
HotelAt least 60% hotel and hotel-related uses, at most 40% commercial. Only the commercial part can be strata subdivided; hotel rooms can’t.
WhiteAny mix of commercial, hotel, residential and compatible uses (Marina Bay).
Residential / InstitutionFlats or condos plus community uses (childcare, homes for the aged). Not funeral parlours or workers’ dormitories.
Commercial / InstitutionCommercial and community uses, e.g. offices, shops, childcare. Not funeral parlours or workers’ dormitories. No flats.
Civic and Community InstitutionCourts, fire stations, welfare homes, funeral parlours, workers’ dormitories, subject to evaluation.
Reserve SiteUse not yet decided; compatible interim uses may be allowed.

5Industrial and Business Parks

The 60/40 rule applies to the industrial and business park uses.

Business 1

Clean, light industries; nuisance buffer up to 50 m: software, printing, food packing.

Business 2

General industries (buffer 100 m) and special industries (larger). Can also take most Business 1 uses.

60/40 ruleAt least 60% GFA core industrial, at most 40% ancillary (offices, showrooms, canteens), for each strata unit and the whole development. 40% × 300 m² = 120 m² office max. Minimum industrial unit: 150 m².

B1-White / B2-White

Industrial uses must first reach a minimum plot ratio. “4.2 [B-2.5] W”: Business to 2.5, then White up to 4.2 overall.

Strata subdivision

Single-user: no. Multiple-user: yes.

Business Park

High-tech, R&D, knowledge-intensive, non-pollutive. At least 85% business park, up to 15% White. No bulk warehousing. BP-White: White share as shown, e.g. BP-W[40] up to 40%. Business park part follows 60/40.

JTC premisesRule
TenantsNo subletting, except to related businesses
LesseesMay apply to sublet up to 30% of GFA for up to 3 years
Lease transferNeeds JTC approval; not allowed with under 5 years left

6Change of use and home businesses

Changing Use Class generally needs planning permission.

Needs permission
  • One Use Class to another (shop, Class I, to tuition centre, Class XVIII)
  • To or between unclassified uses
Not a change of use
  • New tenant, same approved use
  • Change of owner
Pre-authorisedIn commercial buildings, some switches (shop, restaurant, showroom) if set conditions are met.
No substituteA landlord’s consent or business licence doesn’t replace URA’s permission.
ChildcareCommercial buildingLanded house
PermissionNot needed if no special use conditions, centre under 50% of GFA, operator licensedNeeded
WhereNot in the homes of a mixed developmentDetached or a pair of semi-Ds, outside GCB Areas; no other centre within 350 m; not on a major road or near a junction, bend, cul-de-sac or no-through road
Home Office SchemeHome-Based Business
WhatBusiness admin from homeSmall activities: baking, private tuition
ApprovalRegister: URA (private), HDB (HDB flats)No URA approval
Non-residentsUp to 2 may work thereNone may work there
LimitsNo client visits; no tuition centresPrivate tuition: up to 3 students at a time
TenantOwner’s written consentOwner’s consent

“SOHO”

Marketing term. Approved for residential or office, not both; describe by approved use.

Commercial school

Tuition, language, computer, art, music, dance, cooking. A tuition centre needs its own premises.

Childcare centre

Includes kindergartens, infant care, student care; own rules.

7Conservation

Areas of special architectural, historic or cultural value.

Historic Conservation Areas
Historic Districts: Chinatown, Kampong Glam, Little India, Boat QuayResidential Historic Districts, e.g. Emerald Hill, Cairnhill
Secondary Settlements, e.g.
Joo ChiatGeylangTiong Bahru
Conservation permission from URAFor all works, front or rear, even repainting the façade, and any other development including a change of use. In a Conservation Area, Written Permission takes this form, not planning permission. National monuments: a separate regime (Preservation of Monuments Act, NHB).
3RMaximum RetentionSensitive RestorationCareful Repair
1

Category 1

E.g. new rear extension. Registered architect.

2

Category 2

Architect or professional engineer.

3

Category 3

Minor works, repairs: repainting, like-for-like windows. Owner or contractor can apply.

AreaRear extension / control
Historic DistrictsStrictest: the whole building
Residential Historic DistrictsLower than the main roof, max 3 storeys
Secondary SettlementsUp to the height URA allows for the area

Not allowed in HCAs (new)

  • Bars, pubs, nightclubs, karaoke
  • Massage, spas
  • Amusement centres
  • Car showrooms
  • Pollutive trades

Core Chinatown, Kampong Glam, Little India

1st storey: activity-generating uses (shops). Offices upper storeys only; banks considered on any storey.

Use follows zoning

Not frozen at the old use. Conserved bungalow on a flats or condo site may be strata subdivided into apartments or used as a clubhouse, subject to URA’s evaluation.

Homes in HCAs

Max 6 people, each staying at least 3 months, at least 10 m² each. No workers’ quarters, boarding houses or hostels.

8Land Betterment Charge

Since 1 August 2022: tax on the rise in land value.

Triggerpermission for higher-value use or intensity, or changing a restrictive covenant in a State title
charged by▸
SLAadministers and collects, not URA
pay within▸
1 monthof SLA’s Liability Order

Replaced

Development Charge, Differential Premium, Temporary Development Levy.

Table of Rates

Used in most cases; revised 1 March and 1 September. Choosing valuation instead can’t be reversed.

9Offences and enforcement

Penalties and who is liable.

Unauthorised developmentFine up to $200,000, plus up to $10,000 a day if it continues after conviction.
Demolition in a Conservation AreaWithout permission: fine up to $500,000, jail up to 12 months, or both.

Enforcement notice

On owner, occupier or anyone responsible. Effective at least 14 days after service; appeal to the Minister before then. Not complying is an offence.

Owner presumed to have allowed it

For a tenant’s or contractor’s unauthorised works, unless the owner proves they took all reasonable precautions, or couldn’t prevent it with due diligence.

Common traps

Read these the night before.

Master Plan: reviewed every 5 years, guides 10–15 years. Long-Term Plan: about every 10 years, looks 50 years ahead.
The current Master Plan is MP2025, gazetted 1 December 2025.
Site coverage isn’t plot ratio: coverage limits the footprint; GPR limits total floor area.
Voids aren’t strata area for applications from 1 June 2023, but all strata area counts as GFA.
Commercial & Residential is 60% homes, 40% commercial, not the other way round.
Hotel rooms and serviced apartments can’t be strata subdivided.
The Land Betterment Charge goes to SLA, not URA.
No short stays in private homes: under 3 consecutive months isn’t allowed.
Syllabus from 1 January 2027Extract planning parameters from URA SPACE; co-living (a marketing term, using residential, serviced apartment or hotel premises and their rules) and co-working are added; the Land Betterment Charge moves into the State Lands unit. See the full notes.

Read the full Lesson 2 notes free

The full notes cover every point in detail, with the law and CEA references. Create a free account with just your email. No password and no payment. You also get one chapter of practice questions free.

Sign up freeAlready have an account? Sign in

Our own summary. Figures checked against official sources on 3 October 2026.

Practise Lesson 2Exam-style questions at three levels, with an explanation for every answer.
Practise this chapter →

Want the full set?

Option to Pass has 1,850+ original questions across all 16 chapters at three levels, 80+ case studies and two full mock papers in the real exam format. Lesson 1A is free, with no sign-up.